Long Term Control Plan Update & Sewer Separation – Speedway, Indiana
The Town of Speedway is implementing aggressive solutions to stormwater management and has taken the “Green” Flag in its race to solve drainage issues, as well as being on the… Read More
Pogues Run CSO 143 Basin Sewer Separation – Indianapolis, Indiana
Pogues Run CSO 143 Basin Sewer Separation City of Indianapolis, Indiana The Problem The Pogues Run Combined Sewer Overflow (CSO) 143 Basin Sewer Separation Project separates the combined portions of… Read More
Oak Hill/Bergdolt Road – Vanderburgh County, Indiana
Oak Hill/Bergdolt Road Vanderburgh County, Indiana The Project Commonwealth Engineers, Inc. provided construction engineering and inspection services for the construction of the improvements for the Oak Hill Road and Bergdolt… Read More
Hoosier Avenue & Main Street Preventative Maintenance Project – Oolitic, Indiana
The Project The Town of Oolitic received federal funding through the American Recovery and Reinvestment Act (ARRA) for preventative maintenance work on the two main thoroughfares in the Town –… Read More
Akron Hike and Bike Multi-Use Recreational Trail – Akron, Indiana
Hike and Bike Multi-Use Recreational Trail Town of Akron, Indiana Commonwealth Engineers provided engineering services to prepare a preliminary study, prepare the grant applications, prepare the construction plans and specifications,… Read More
East Lake Dam Rehabilitation Project East Lake Lot Owner’s Association – Ninevah, Indiana
East Lake Dam Rehabilitation Project East Lake Lot Owner’s Association, City of Ninevah, Indiana The Problem The East Lake Dam is an earthen dam that is about 40 feet high… Read More
Eagle Creek Dam Inspection and Shoreline Stabilization – Indianapolis, Indiana
Eagle Creek Dam Inspection and Shoreline Stabilization City of Indianapolis, Indiana The Project Work consisted of a comprehensive technical inspection of the Eagle Creek Dam, a 75-foot tall x 5,100… Read More
Wastewater Treatment Plant Levee Project – Huntingburg, Indiana
Wastewater Treatment Plant Levee Project City of Huntingburg, Indiana The Problem The inundation of its wastewater treatment plant in 1996 jeopardized Huntingburg’s ability to keep floodwaters out of its main… Read More
Dam Replacement & Lake Shoreline Reconstruction – Avon, Indiana
The Problem The project consisted of reconstructing the Town’s failing dam and making it durable enough to be overtopped and accessible for the public and park maintenance. The Solution Viewing… Read More
South Trunk Line Collection System Project – Berne, Indiana
The Problem The project consisted of a sewer separation design of over 10,000 feet of storm sewer pipe ranging in size from 12 inches to 60 inches in diameter and… Read More
Deep Rock Tunnel Connector Project – Indianapolis, Indiana
Commonwealth Engineers Inc. was hired as part of a design team to perform the planning and design for the Indianapolis Belmont/Southport Interplant Connection. This project was planned to be the… Read More