Summit Lake State Park Algaewheel Treatment System

City of New Castle, Indiana

The Problem

One of the toughest challenges faced by Owners, Operators, and Engineers is the design and operation of a seasonal wastewater treatment facility.  These facilities receive highly variable flows and loadings throughout the year, which makes it very difficult to consistently meet their permitted effluent limits. Adding to this challenge is that most of these seasonal facilities have minimal staff, operate on hairline budgets, and are in dire need of repair/replacement.

The Solution

As a result of the successes experienced by the Indiana Department of Natural Resources (IDNR) at the Indiana Dunes facility, the Commonwealth and One Water Team collaborated with IDNR in the installation of the current generation Algaewheel Treatment System at Summit Lake.

The Summit Lake Algaewheel Treatment System utilizes the existing pre-treatment / screening and effluent disinfection structures.  The existing aeration tanks and clarifiers have been taken offline and can be utilized for excess storage and/or flow equalization.  The Algaewheel Treatment System replaces the existing, now off-line, aeration tanks and clarifiers and provides superior treatment.  The retrofit/replacement took no more than 2 months’ time (from start to finish) and has met permit limits since the time of commissioning.

This system was chosen because it is modest in cost, easy to operate and maintain, readily meets effluent standards even with high variability in flows and loadings, and is operated at a fraction of the electrical costs required by competing “activated sludge” package plant facilities.

Indiana Dunes Algaewheel Performance Analysis

In 2011, the Indiana Dunes State Park, located on the shores of Lake Michigan in Northern Indiana, and The Cincinnati Nature Center, located in Milford, Ohio both installed Algaewheel Treatment System to replace their aging activated sludge treatment plants (package plants).

The advanced algal attached growth system utilizes an ecological balance between algae and bacteria to deliver an efficient and robust treatment system that has the ability to stay viable during periods of low, even zero, flow because of the algae’s ability to use light and CO2 to generate Oand polymers which supply food to the bacteria.

Additional Projects

Wastewater
Inflow and Infiltration Project – Spencer, Indiana
The Spencer Inflow and Infiltration project rehabilitated select sections of the Town’s gravity sewer collection mains, ranging in size from 8 to 15 inches in diameter. The work includes cleaning… Read More
Potable Water
Water Utility Improvements Project – Maysville RWSD
Water Utility Improvements Project – Maysville Regional Water & Sewer District Division A – Water Main Extension The project includes but is not limited to a water main extension including… Read More
Potable Water
Water Utility Improvements Project – Gaston, Indiana
The project includes but is not limited to the replacement of selection sections of the Town’s water mains with a new 6-inch diameter water main. The work included the replacement… Read More
Wastewater
Wastewater Treatment Plant Rehabilitation Owensboro, Kentucky
Project Highlights Upgrade oxidation ditches to BNR process with turbo blowers Rehabilitation of structures & process equipment, including concrete tanks, clarifier equipment, pumps, the UV system, and the PAA system… Read More
Wastewater
Wastewater Treatment Plant Improvements – Greenfield, Indiana
Project Need Originally constructed in the 1960s, updated and expanded through the 2000s Includes one (1) main activated sludge wastewater treatment facility and two (2) trains of Actiflo high-rate settling… Read More
Wastewater
West Side Interceptor Improvements – Richmond, Indiana
Project Highlights Replace gravity sewers Collection system improvements Reduce combined sewer overflows Project Description The Richmond Sanitary District recently finished constructing over $6 million in collection system improvements, which involved… Read More
Wastewater
Wastewater Treatment Improvements – Syracuse, Indiana
The Problem Commonwealth was hired to investigate and provide solutions to an underperforming wastewater treatment system for their oxidation ditches, which was also impacting performance in their clarifiers, requiring frequent… Read More
Potable Water
Water System Improvements – Flora, Indiana
Water System Improvements Town of Flora, Indiana Commonwealth Engineers worked with the Town of Flora on a two-part project to make improvements to their water system. Division “A” – Water… Read More
Wastewater
Long Term Control Plan Improvements – Crown Point, Indiana
Commonwealth Engineers performed a Long Term Control Plan improvements for the City of Crown Point. It included: ANDERSON POND PROJECT The Crown Point Anderson Pond Project is a Long Term… Read More