Wastewater Treatment Improvements

Town of Syracuse, Indiana

The Problem

Commonwealth was hired to investigate and provide solutions to an underperforming wastewater treatment system for their oxidation ditches, which was also impacting performance in their clarifiers, requiring frequent use of water on-site for maintenance needs. The analysis showed the current system was not capable of adjusting to the difference in loading between summer and winter for this lake community.

The Solution

To expedite the improvements, the Owner elected to utilize the Guaranteed Savings approach whereby a Contractor (Provider) is selected, and then a Guaranteed Maximum Price is established. Kokosing Construction Company was selected to implement improvements to address performance issues and aging infrastructure throughout the wastewater treatment facility.

The work modified the oxidation ditches to improve flow movement, eliminated four (4) high-horsepower mixers, installation of a new blower and aeration system, and made miscellaneous improvements to the grit pumping system, grit classifier, and influent gate. Within 24 hours of being online, the improved performance was visibly noticeable in the clarifier. This approach saved months on the schedule, and through the process, the Owner was able to apply and be awarded a NIPSCO rebate for approximately $90,000. The Owner elected to perform additional work at a cost higher than project savings. The difference was added to the contract.

Additional Projects

Wastewater
Wastewater & Stormwater Utility Planning Improvements – Arcadia, Indiana
Project Need PER was developed to outline capital improvements necessary to address anticipated Early Warning Sewer Ban issues as a result of hydraulic overload. PER developed to modify the existing… Read More
Wastewater
Wastewater Treatment Plant Rehabilitation Owensboro, Kentucky
Project Highlights Upgrade oxidation ditches to BNR process with turbo blowers Rehabilitation of structures & process equipment, including concrete tanks, clarifier equipment, pumps, the UV system, and the PAA system… Read More
Potable Water
Water Utility Improvements Project – Division A – Water Treatment Plant – Arcadia, Indiana
Project Highlights: OCRA funded Installation of a new settling tank ladder Replacement of the aerator blower Replacement 4-inch actuated butterfly valve Backwash flow meter Project Description: The project includes, but… Read More
Potable Water
Water Utility Improvements Project – Leavenworth, Indiana
Project Highlights: OCRA and SRF Funds – Total Grant / Loan Forgiveness $1,485,000 and $85,000 Loan Installation of a new 65,000 glass-fused-to-steel tank with an internal mixer Replacement of booster… Read More
Potable Water
Water Utility Improvements Project – L&M Water Utility, Losantville, Indiana
Project Highlights: OCRA Funded SRF Funded Distribution System Improvements Regional Project Project Description: The L&M Regional Water District constructed a new water main loop around the town of Losantville to… Read More
Wastewater
Wastewater Treatment Plant Improvements – Greenfield, Indiana
Project Need Originally constructed in the 1960s, updated and expanded through the 2000s Includes one (1) main activated sludge wastewater treatment facility and two (2) trains of Actiflo high-rate settling… Read More
Potable Water
Water Utility Improvements Project – St. Bernice Water Corporation, Clinton, Indiana
Project Highlights: Booster station improvements Distribution system improvements Service line replacements Customer meter replacements Storage tank repairs New administration building SRF & RD Funding Project Description: St. Bernice Water Corporation… Read More
Wastewater
Inflow and Infiltration Project – Spencer, Indiana
Project Highlights Gravity sewer New manhole installation Pavement restoration OCRA Funded The Spencer Inflow and Infiltration project rehabilitated select sections of the Town’s gravity sewer collection mains, ranging in size… Read More
Potable Water
Water Utility Improvements Project – Reelsville Water Authority, Reelsville, Indiana
Project Highlights: 4-inch water main 6-inch water main New pre-engineered metal storage building Installation of pressure-reducing valve bypass Distribution System Improvements  The project includes but is not limited to installing… Read More