Eagle Creek Dam Inspection and Shoreline Stabilization

City of Indianapolis, Indiana

The Project

Work consisted of a comprehensive technical inspection of the Eagle Creek Dam, a 75-foot tall x 5,100 foot long earthen and concrete dam with six (6) 40′ x 31′ tainter gates. It is one of the largest dams in Indiana. This complex structure was evaluated using a multi-discipline inspection team approach.

The Solution

The Eagle Creek Shoreline Stabilization Project was developed as a result of two biennium high hazard dam inspections completed by Commonwealth Engineers in 2003 and 2006 for the City of Indianapolis. A very steep erosion was discovered within 16 feet of an active road known as Dandy Trail. The side slope was eroding down to the Eagle Creek Reservoir and was progressively moving slowly towards the road. In 2008 Commonwealth was selected to provide construction inspection services for the reconstruction of 1,500 feet of this shoreline. The $1.28 million project called for laying the slope back to 3:1 where land was available to do so. But, the north half of the project was located in close proximity to Dandy Trail. To stabilize this segment, about 665 ft. x 15 ft. (10,000 SF) of reinforced soil wall was installed, and landscaping was placed for erosion control and aesthetics.

Additional Projects

Wastewater
Inflow and Infiltration Project – Spencer, Indiana
The Spencer Inflow and Infiltration project rehabilitated select sections of the Town’s gravity sewer collection mains, ranging in size from 8 to 15 inches in diameter. The work includes cleaning… Read More
Potable Water
Water Utility Improvements Project – Maysville RWSD
Water Utility Improvements Project – Maysville Regional Water & Sewer District Division A – Water Main Extension The project includes but is not limited to a water main extension including… Read More
Potable Water
Water Utility Improvements Project – Gaston, Indiana
The project includes but is not limited to the replacement of selection sections of the Town’s water mains with a new 6-inch diameter water main. The work included the replacement… Read More
Wastewater
Wastewater Treatment Plant Rehabilitation Owensboro, Kentucky
Project Highlights Upgrade oxidation ditches to BNR process with turbo blowers Rehabilitation of structures & process equipment, including concrete tanks, clarifier equipment, pumps, the UV system, and the PAA system… Read More
Wastewater
Wastewater Treatment Plant Improvements – Greenfield, Indiana
Project Need Originally constructed in the 1960s, updated and expanded through the 2000s Includes one (1) main activated sludge wastewater treatment facility and two (2) trains of Actiflo high-rate settling… Read More
Wastewater
West Side Interceptor Improvements – Richmond, Indiana
Project Highlights Replace gravity sewers Collection system improvements Reduce combined sewer overflows Project Description The Richmond Sanitary District recently finished constructing over $6 million in collection system improvements, which involved… Read More
Wastewater
Wastewater Treatment Improvements – Syracuse, Indiana
The Problem Commonwealth was hired to investigate and provide solutions to an underperforming wastewater treatment system for their oxidation ditches, which was also impacting performance in their clarifiers, requiring frequent… Read More
Potable Water
Water System Improvements – Flora, Indiana
Water System Improvements Town of Flora, Indiana Commonwealth Engineers worked with the Town of Flora on a two-part project to make improvements to their water system. Division “A” – Water… Read More
Wastewater
Long Term Control Plan Improvements – Crown Point, Indiana
Commonwealth Engineers performed a Long Term Control Plan improvements for the City of Crown Point. It included: ANDERSON POND PROJECT The Crown Point Anderson Pond Project is a Long Term… Read More