East Side Interceptor Replacement – Phase I & II

City of Richmond, Indiana

Phase I, II, and III of this project primarily involve (a) replacing approximately 14,000 lineal feet of existing 36-inch East Side Interceptor with a 54-inch interceptor using a combination of open cut and micro-tunneling construction, (b) constructing several large connections and drop structures, and (c) replacing the influent channel structure near the WWTP headworks. These projects are part of a three-phase sequence to reduce overflows on the east side of the City and to comply with the City’s Long Term Control Plan (LTCP). Preliminary engineering on this project included surveying the existing interceptor and creating a hydraulic model using XPSWMM to determine the most efficient configuration and alignment of the new sewer. Unique features of this project include:

  • The open cut portion is located parallel to the Whitewater River on a 2:1 sloped hill (which falls at least 80 feet from top to bottom) within a very narrow construction easement with single ingress and egress, and
  • The micro tunneling portion is located in a heavily developed urban setting, approximately 50 feet below grade, with large construction shafts to accommodate the connection and drop structures.

Additional Projects

Wastewater
Inflow and Infiltration Project – Spencer, Indiana
The Spencer Inflow and Infiltration project rehabilitated select sections of the Town’s gravity sewer collection mains, ranging in size from 8 to 15 inches in diameter. The work includes cleaning… Read More
Potable Water
Water Utility Improvements Project – Maysville RWSD
Water Utility Improvements Project – Maysville Regional Water & Sewer District Division A – Water Main Extension The project includes but is not limited to a water main extension including… Read More
Potable Water
Water Utility Improvements Project – Gaston, Indiana
The project includes but is not limited to the replacement of selection sections of the Town’s water mains with a new 6-inch diameter water main. The work included the replacement… Read More
Wastewater
Wastewater Treatment Plant Rehabilitation Owensboro, Kentucky
Project Highlights Upgrade oxidation ditches to BNR process with turbo blowers Rehabilitation of structures & process equipment, including concrete tanks, clarifier equipment, pumps, the UV system, and the PAA system… Read More
Wastewater
Wastewater Treatment Plant Improvements – Greenfield, Indiana
Project Need Originally constructed in the 1960s, updated and expanded through the 2000s Includes one (1) main activated sludge wastewater treatment facility and two (2) trains of Actiflo high-rate settling… Read More
Wastewater
West Side Interceptor Improvements – Richmond, Indiana
Project Highlights Replace gravity sewers Collection system improvements Reduce combined sewer overflows Project Description The Richmond Sanitary District recently finished constructing over $6 million in collection system improvements, which involved… Read More
Wastewater
Wastewater Treatment Improvements – Syracuse, Indiana
The Problem Commonwealth was hired to investigate and provide solutions to an underperforming wastewater treatment system for their oxidation ditches, which was also impacting performance in their clarifiers, requiring frequent… Read More
Potable Water
Water System Improvements – Flora, Indiana
Water System Improvements Town of Flora, Indiana Commonwealth Engineers worked with the Town of Flora on a two-part project to make improvements to their water system. Division “A” – Water… Read More
Wastewater
Long Term Control Plan Improvements – Crown Point, Indiana
Commonwealth Engineers performed a Long Term Control Plan improvements for the City of Crown Point. It included: ANDERSON POND PROJECT The Crown Point Anderson Pond Project is a Long Term… Read More