Inflow and Infiltration Project
Town of Spencer, Indiana
The Spencer Inflow and Infiltration project rehabilitated select sections of the Town’s gravity sewer collection mains, ranging in size from 8 to 15 inches in diameter. The work includes cleaning and pre-lining closed circuit video inspection of approximately 27,000 linear feet of gravity sewer, cured-in-place pipe lining of approximately 8,350 feet of gravity sewer, and bypass pumping. It also includes the inspection of the internal lining of select manholes, new manhole installation, plus manhole repair and adjustment, pavement restoration, traffic control, and all other work required for the complete project.