Long Term Control Plan Improvements

City of Crown Point, Indiana

Commonwealth Engineers performed a Long Term Control Plan improvements for the City of Crown Point. It included:

ANDERSON POND PROJECT

The Crown Point Anderson Pond Project is a Long Term Control Plan (LTCP) project implemented to reduce the number of Combined Sewer Overflows (CSOs) at the WWTP. As a result of the Anderson Pond project, the City has noted a decrease of some 80% of their historical CSOs at the WWTP.

FLOATABLE CONTROLS PROJECT

This project provides upgrades to the City’s existing overflow points in compliance with the State and Federal Nine Minimum Controls for floatable solids removal. Floatable controls structures were then designed for the three (3) existing discharge points.

CSO LIFT STATION

The project includes 40 MGD wet weather lift stations and associated controls. This is an LTCP project implemented to eliminate CSOs to IDEM/EPA specified perimeters.

Additional Projects

Wastewater
Wastewater Treatment Plant Improvements – City of Berne, Indiana
The Problem The City of Berne operates a Class II, 0.683 MGD controlled discharge waste stabilization lagoon facility consisting of a 16.42-acre lagoon (#1), a final 21.15-acre lagoon (#2), two… Read More
Wastewater
Wastewater Treatment Improvements – Town of Syracuse, Indiana
The Problem Commonwealth was hired to investigate and provide solutions to an underperforming wastewater treatment system for their oxidation ditches, which was also impacting performance in their clarifiers requiring frequent… Read More
Potable Water
Water System Improvements – Town of Flora, Indiana
Water System Improvements Town of Flora, Indiana Commonwealth Engineers worked with the Town of Flora on a two-part project to make improvements to their water system. Division “A” – Water… Read More
Wastewater
Long Term Control Plan Improvements – City of Crown Point, Indiana
Commonwealth Engineers performed a Long Term Control Plan improvements for the City of Crown Point. It included: ANDERSON POND PROJECT The Crown Point Anderson Pond Project is a Long Term… Read More
Wastewater
Long Term Control Plan & Sewer System Modeling – City of Madison, Indiana
Long Term Control Plan & Sewer System Modeling City of Madison, Indiana Commonwealth Engineers performed a Value Engineering / Alternatives Assessment to the City’s CSO Collection System Improvements Project. Coordinated… Read More
Potable Water
Water System Improvements Project – Town of West Terre Haute, Indiana
A Preliminary Engineering Report and Environmental Report were conducted to address West Terre Haute’s water system concerns.  Reports were completed in compliance with USDA Rural Development/State Revolving Fund Standards to… Read More
Wastewater
Long Term Control Plan Improvements Project – City of Nappanee, Indiana
Long Term Control Plan Improvements Project City of Nappanee, Indiana CSO Interceptor and Wet Weather Treatment and Storage Facilities Project: This project provides collection and treatment of excessive combined sewage… Read More
Wastewater
Wastewater Treatment Plant Improvements – Town of Fairmount, Indiana
Wastewater Treatment Plant Improvements Town of Fairmount, Indiana Commonwealth Engineers, Inc. (Commonwealth) performed value engineering and construction oversight/inspection for the noted WWTP Improvements Project. Efforts commenced with our Value Engineering… Read More
Stormwater
Crown Point Sewer Improvements Project – City of Crown Point, Indiana
Crown Point Sewer Improvements City of Crown Point, Indiana As part of the Long Term Control Plan, the City of Crown Point continues to find grant funding and savings options… Read More