Wastewater & Stormwater Utility Planning & Improvements

Town of Arcadia, Indiana

Project Need

  • PER was developed to outline capital improvements necessary to address anticipated Early Warning Sewer Ban issues as a result of hydraulic overload.
  • PER developed to modify the existing Agreed Order with IDEM to a more affordable and focused regime of improvements – than those originally outlined by the previous Engineer.
  • Coordination with the County Surveyor’s Office to aid in the financing and scope of stormwater improvement projects that would also prove beneficial to the wastewater utility.
  • Coordination with IDEM regarding historical violations and existing deficiencies.

Project Description

Division “A” – WWTP Improvements

The project includes, but is not limited to, the conversion of an existing polishing pond to an equalization basin, the installation of approximately 500 feet of 15-inch gravity sanitary sewer along with manholes, a bypass structure, the refurbishment of the existing oxidation ditch and clarifier equipment, and the conversion of a chlorine contact tank to ultraviolet light disinfection channel.

Division “B” – Sanitary and Stormwater Improvements

The project includes, but is not limited to, the separation of cross-connected storm and sanitary sewers at several locations, the installation of approximately 2,000 feet of 8-inch gravity sanitary sewer, 1,000 feet of 6-inch force main, a lift station, and approximately 900 feet of 12-inch storm sewer and 400 feet of 15-inch storm sewer with manholes and inlet structures.  

Division “C” – Sanitary Sewer System Rehabilitation

The project includes but is not limited to rehabilitating sanitary sewer pipes and manholes.  The work includes rehabilitating 7,100 feet of 8-inch pipe and 2,250 feet of 12” pipe through CIPP installation.  Thirty-six (36) manholes are to be rehabilitated.

Additional Projects

Wastewater
Wastewater & Stormwater Utility Planning Improvements – Arcadia, Indiana
Project Need PER was developed to outline capital improvements necessary to address anticipated Early Warning Sewer Ban issues as a result of hydraulic overload. PER developed to modify the existing… Read More
Wastewater
Wastewater Treatment Plant Rehabilitation Owensboro, Kentucky
Project Highlights Upgrade oxidation ditches to BNR process with turbo blowers Rehabilitation of structures & process equipment, including concrete tanks, clarifier equipment, pumps, the UV system, and the PAA system… Read More
Potable Water
Water Utility Improvements Project – Division A – Water Treatment Plant – Arcadia, Indiana
Project Highlights: OCRA funded Installation of a new settling tank ladder Replacement of the aerator blower Replacement 4-inch actuated butterfly valve Backwash flow meter Project Description: The project includes, but… Read More
Potable Water
Water Utility Improvements Project – Leavenworth, Indiana
Project Highlights: OCRA and SRF Funds – Total Grant / Loan Forgiveness $1,485,000 and $85,000 Loan Installation of a new 65,000 glass-fused-to-steel tank with an internal mixer Replacement of booster… Read More
Potable Water
Water Utility Improvements Project – L&M Water Utility, Losantville, Indiana
Project Highlights: OCRA Funded SRF Funded Distribution System Improvements Regional Project Project Description: The L&M Regional Water District constructed a new water main loop around the town of Losantville to… Read More
Wastewater
Wastewater Treatment Plant Improvements – Greenfield, Indiana
Project Need Originally constructed in the 1960s, updated and expanded through the 2000s Includes one (1) main activated sludge wastewater treatment facility and two (2) trains of Actiflo high-rate settling… Read More
Potable Water
Water Utility Improvements Project – St. Bernice Water Corporation, Clinton, Indiana
Project Highlights: Booster station improvements Distribution system improvements Service line replacements Customer meter replacements Storage tank repairs New administration building SRF & RD Funding Project Description: St. Bernice Water Corporation… Read More
Wastewater
Inflow and Infiltration Project – Spencer, Indiana
Project Highlights Gravity sewer New manhole installation Pavement restoration OCRA Funded The Spencer Inflow and Infiltration project rehabilitated select sections of the Town’s gravity sewer collection mains, ranging in size… Read More
Potable Water
Water Utility Improvements Project – Reelsville Water Authority, Reelsville, Indiana
Project Highlights: 4-inch water main 6-inch water main New pre-engineered metal storage building Installation of pressure-reducing valve bypass Distribution System Improvements  The project includes but is not limited to installing… Read More