Wastewater Treatment Plant & Collection System

Town of Newport, Indiana

Project Background

The Town of Newport, Indiana, was the last County Seat in the State of Indiana that remained unsewered. Documented issues with Escherichia coli (E. coli) in open waterways resulted in the County Sanitarian requiring the Town to address this threat to the health of their community and the environment.

A new treatment plant and collection system can be a costly endeavor for a small town. In addition, an open-cut gravity sewer system can be extremely difficult to install without damaging the existing infrastructure and historic areas. Some engineering firms suggested the use of Lagoons, but Commonwealth understood that after only 5 years of operation, upon the renewal of their NPDES permit, IDEM would establish an acute ammonia requirement that would not be met with a Lagoon System.

Commonwealth Engineers’ expertise in technology, as well as regulations and funding, helped the Town of Newport to become the first project in the State of Indiana to obtain grants from all three funding agencies, SRF, USDA, and OCRA, and achieve 75% of project costs in grants and 25% in loans. Furthermore, the quality of the design and close construction monitoring resulted in the construction phase of the project being completed under budget with a remaining construction contingency of upwards of $450,000.  All construction contingencies were able to be conserved with minimal change orders during construction (the industry standard is typically 3-4% above bid costs).  The contingencies afforded the Town to utilize the additional funds for wastewater-related needs for their new utility, such as vehicles, tools, equipment, and more.

Project Highlights

The New Wastewater Treatment and Collection System project included providing a new wastewater utility for the unsewered Town of Newport. The sanitary collection system consists of low-pressure sewers with approximately 207 grinder pump stations. The treatment system consists of a mechanical extended aeration treatment plant, ultraviolet disinfection, plant outfall structure, lab building, and all required ancillary equipment. The proposed collection system consists of 26,000 linear feet of pressure sewer main installed via directional drilling methods to minimize land disturbance and subsequent surface restoration.  The average daily design flow to the plant is 0.047 MGD, and the peak design flow is 0.149 MGD.

  • New wastewater utility and improved environmental quality for the Town and nearby waterways with minimal construction impact on the community.
  • Improved economic viability for the Town (the Vermillion County Seat).
  • Various funding, making the project affordable: RD Grant $3,450,000; RD Loan $1,375,000; SRF Loan Forgiveness $600,000; OCRA Grant $500,000.
  • Quality of design, close construction monitoring, and minimal change orders resulted in all construction contingencies being preserved, which allowed the Town to purchase additional equipment for their new wastewater utility, including these major items: Backhoe, ATV, Vacuum Truck, Utility Service Vehicle, and more.

Additional Projects

Wastewater
Wastewater Treatment Plant Rehabilitation Owensboro, Kentucky
Wastewater Treatment Plant Rehabilitation Project Need Upgrade oxidation ditches to BNR process with turbo blowers Rehabilitation of structures & process equipment, including concrete tanks, clarifier equipment, pumps, the UV system,… Read More
Wastewater
Wastewater Treatment Plant Improvements – Greenfield, Indiana
Project Need Originally constructed in the 1960s, updated and expanded through the 2000s Includes one (1) main activated sludge wastewater treatment facility and two (2) trains of Actiflo high-rate settling… Read More
Wastewater
West Side Interceptor Improvements – Richmond, Indiana
Project Highlights Replace gravity sewers Collection system improvements Reduce combined sewer overflows Project Description The Richmond Sanitary District recently finished constructing over $6 million in collection system improvements, which involved… Read More
Wastewater
Wastewater Treatment Improvements – Syracuse, Indiana
The Problem Commonwealth was hired to investigate and provide solutions to an underperforming wastewater treatment system for their oxidation ditches, which was also impacting performance in their clarifiers, requiring frequent… Read More
Potable Water
Water System Improvements – Flora, Indiana
Water System Improvements Town of Flora, Indiana Commonwealth Engineers worked with the Town of Flora on a two-part project to make improvements to their water system. Division “A” – Water… Read More
Wastewater
Long Term Control Plan Improvements – Crown Point, Indiana
Commonwealth Engineers performed a Long Term Control Plan improvements for the City of Crown Point. It included: ANDERSON POND PROJECT The Crown Point Anderson Pond Project is a Long Term… Read More
Wastewater
Long Term Control Plan & Sewer System Modeling – Madison, Indiana
Long Term Control Plan & Sewer System Modeling City of Madison, Indiana Commonwealth Engineers performed a Value Engineering / Alternatives Assessment of the City’s CSO Collection System Improvements Project. Coordinated… Read More
Potable Water
Water System Improvements Project – West Terre Haute, Indiana
A Preliminary Engineering Report and Environmental Report were conducted to address West Terre Haute’s water system concerns.  Reports were completed in compliance with USDA Rural Development/State Revolving Fund Standards to… Read More
Wastewater
Long Term Control Plan Improvements Project – Nappanee, Indiana
Long Term Control Plan Improvements Project City of Nappanee, Indiana CSO Interceptor and Wet Weather Treatment and Storage Facilities Project This project provides collection and treatment of excessive combined sewage… Read More