Wastewater Treatment Plant Improvements

Town of Fairmount, Indiana

Commonwealth Engineers, Inc. performed value engineering and construction oversight/inspection for the noted WWTP Improvements Project.

Efforts commenced with our Value Engineering (VE) Team. This VE Team was tasked with developing cost-saving recommendations consistent with the project goals and objectives as well as the identification of areas of concern with the design (by others) that merited the Town’s attention and consideration.

The VE Team consisted of highly qualified Professional Engineers, a Master Electrician/Instrumentation and Control Specialist, and a Construction Estimator experienced and specialized in municipal public works wastewater projects of this nature. The Team evaluated project components integral and related to the published design and identified in excess of $500,000 in cost savings opportunities (which was realized at project bidding). The VE Team also identified and addressed several potential constructability issues, as well as clarified work items required to ensure accurate bidding.

Major project work elements included the following facilities and equipment: mechanical fine screen, sewage pumps, grit removal facilities, alum building, rehabilitation of the oxidation ditch, flow split structure, secondary clarifiers, chlorination facilities, dechlorination facilities, and meter structure. The work also included plant access drive, paving, yard piping, process piping, demolition, excavation, dewatering, regrading, site restoration, coatings, electrical work, instrumentation and control, clean-up, and all other related work and appurtenances necessary to complete the work for the Fairmount Wastewater Treatment Plant Expansion.

Commonwealth’s Construction Engineering and Inspection efforts resulted in the Town retaining the majority of the initially budgeted construction contingency funds, which allowed us to solicit the use of over $250,000 in remaining funds for additionally required wastewater utility improvements and purchases.

 

Additional Projects

Wastewater
Wastewater & Stormwater Utility Planning Improvements – Arcadia, Indiana
Project Need PER was developed to outline capital improvements necessary to address anticipated Early Warning Sewer Ban issues as a result of hydraulic overload. PER developed to modify the existing… Read More
Wastewater
Wastewater Treatment Plant Rehabilitation Owensboro, Kentucky
Project Highlights Upgrade oxidation ditches to BNR process with turbo blowers Rehabilitation of structures & process equipment, including concrete tanks, clarifier equipment, pumps, the UV system, and the PAA system… Read More
Potable Water
Water Utility Improvements Project – Division A – Water Treatment Plant – Arcadia, Indiana
Project Highlights: OCRA funded Installation of a new settling tank ladder Replacement of the aerator blower Replacement 4-inch actuated butterfly valve Backwash flow meter Project Description: The project includes, but… Read More
Potable Water
Water Utility Improvements Project – Leavenworth, Indiana
Project Highlights: OCRA and SRF Funds – Total Grant / Loan Forgiveness $1,485,000 and $85,000 Loan Installation of a new 65,000 glass-fused-to-steel tank with an internal mixer Replacement of booster… Read More
Potable Water
Water Utility Improvements Project – L&M Water Utility, Losantville, Indiana
Project Highlights: OCRA Funded SRF Funded Distribution System Improvements Regional Project Project Description: The L&M Regional Water District constructed a new water main loop around the town of Losantville to… Read More
Wastewater
Wastewater Treatment Plant Improvements – Greenfield, Indiana
Project Need Originally constructed in the 1960s, updated and expanded through the 2000s Includes one (1) main activated sludge wastewater treatment facility and two (2) trains of Actiflo high-rate settling… Read More
Potable Water
Water Utility Improvements Project – St. Bernice Water Corporation, Clinton, Indiana
Project Highlights: Booster station improvements Distribution system improvements Service line replacements Customer meter replacements Storage tank repairs New administration building SRF & RD Funding Project Description: St. Bernice Water Corporation… Read More
Wastewater
Inflow and Infiltration Project – Spencer, Indiana
Project Highlights Gravity sewer New manhole installation Pavement restoration OCRA Funded The Spencer Inflow and Infiltration project rehabilitated select sections of the Town’s gravity sewer collection mains, ranging in size… Read More
Potable Water
Water Utility Improvements Project – Reelsville Water Authority, Reelsville, Indiana
Project Highlights: 4-inch water main 6-inch water main New pre-engineered metal storage building Installation of pressure-reducing valve bypass Distribution System Improvements  The project includes but is not limited to installing… Read More