Projects for Bid

St. Joe-Spencerville Regional Sewer District – Wastewater Treatment Plant Improvements (S22031)

$150.00$400.00

Description

ADVERTISEMENT FOR BIDS

ST. JOE-SPENCERVILLE REGIONAL SEWER DISTRICT

DEKALB COUNTY, INDIANA

WASTEWATER TREATMENT PLANT IMPROVEMENTS

General Notice

St. Joe-Spencerville Regional Sewer District (Owner) is requesting sealed Bid packets for the construction of the following Project:

Wastewater Treatment Plant Improvements

Project #S22031

Sealed Bids for the construction of the Project will be received at the St. Joe-Spencerville Regional Sewer District Office located at 315 Spencer Street, St. Joe, IN 46785, until Thursday, October 10th at 10:00 a.m. local time. At that time the Bids received will be publicly opened and read at the Wastewater Treatment Plant, 6313 SR 1, St. Joe, IN 46785.

All interested citizens are invited to attend and should any citizens require special provisions, such as handicapped modifications or non-English translation personnel, the District will provide such provisions as long as the request is made by September 30, 2024.

The Project includes the following Work:

The project includes but is not limited to demolition of the two existing packaged plants and blowers; new extended aeration tanks and equipment; new secondary clarifiers; new UV disinfection system; new aerobic digesters; new blowers; new generator; and new controls. The work includes demolition, earthwork, concrete work, piping, electrical, instrumentation and controls, and all other work required for the completion of the project.

Bids will be received for a single prime Contract.  Bids shall be as shown in the Bid Form.

Obtaining the Bidding Documents

The Issuing Offices for the Bidding Documents are: Commonwealth Engineers, Inc., 9604 Coldwater Road, Suite 203, Fort Wayne, IN 46825 and Commonwealth Engineers, Inc., 7256 Company Drive, Indianapolis, IN 46237.  Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 a.m. to 5:00 p.m. and may obtain copies of the Bidding Documents from the Issuing Office as described below.  Prospective Bidders may also examine the drawings via the Web-based service of Commonwealth Engineers, Inc. at www.commonwealthengineers.com.

Bidding Documents also may be examined at the office of the St. Joe-Spencerville Regional Sewer District, 315 Spencer Street, St. Joe, IN 46785, on Mondays through Thursdays between the hours of 8:00 a.m. to 11:30 a.m.

The Contract Documents, Specifications and Drawings will be provided via the web-based service of Commonwealth Engineers, Inc. at www.commonwealthengineers.com.  The plan holder will receive an email link to the PDF downloadable documents upon payment of a non-refundable fee of One Hundred Fifty and 00/100 Dollars ($150.00) plus 7% sales tax, per project division desired

One set of printed Contract Documents, Specifications and Drawings may be obtained upon payment of an additional non-refundable fee of Two Hundred Fifty and 00/100 Dollars ($250.00) plus 7% sales tax, per project division desired, via the web-based service of Commonwealth Engineers, Inc. at www.commonwealthengineers.com.  Requests for Contract Documents and Specifications and Drawings must also include a return street address; post office box numbers are not acceptable. 

Contract Documents will not be sold separate from the web-based service (i.e. All plan holders will be required to purchase through the web-based service).  Partial sets of Contract Documents, Specifications and Drawings are not available.  Questions pertaining to this project shall be submitted directly to Natalie Schelling, P.E. at Commonwealth Engineers, Inc. via https://login.procore.com.  Additional questions concerning access to the website may be directed to Commonwealth Engineers, Inc. at (317) 888-1177.

All addenda, which may be issued for this Project, will be issued to each plan holder via email.  For those whom also purchase printed Contract Documents, printed addenda will be provided as well.  All plan holders shall note, the printed documents are provided as a courtesy and do not preclude the plan holder from relying upon the web/email based materials (i.e. delays in mail delivery will not be considered relevant due to all contract document holders access to materials via web/email).

No refunds will be issued for this project.

The OWNER reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding.  Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof.  Any bid received after the time and date specified shall not be considered.  NO bid may be withdrawn after the scheduled closing time for receipt of bids for at least 90 days. 

Pre-bid Conference

A pre-bid conference for the Project will be held on Tuesday, September 24th at 1:00 p.m. at St. Joe-Spencerville WWTP, 6313 SR 1, St. Joe, IN 46785. Attendance at the pre-bid conference is encouraged but not required.

Instructions to Bidders

The work to be performed and the bid to be submitted shall include sufficient and proper sums for all general construction, mechanical installation, labor, materials, permits, licenses, insurance, and so forth incidental to and required for the construction of the facilities.

Each bid must be enclosed in a sealed envelope bearing the title of the Project and the name and address of Bidder.  All bids must be submitted on the bid forms as identified in the Contract Documents and Specifications.

Each bid shall be accompanied by a certified check or acceptable bidder’s bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the highest aggregate bid, which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from him to do so within ten (10) days of said notification.

Approved performance and payment bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time of contract execution.  The bonds will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion.

Bid security shall be furnished in accordance with the Instructions to Bidders.

A conditional or qualified Bid will not be accepted.

Award will be made to the low, responsive, responsible bidder.  The low, responsive, responsible bidder must not be debarred, suspended, or otherwise be excluded from or ineligible for participation in federally assisted programs under Executive Order 12549.

All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the project throughout.

Bids shall be properly and completely executed on bid forms included in the Specifications.  Bids shall include all information requested by Indiana Form 96 (Revised 2013) included with the Specifications.  Under Section III of Form 96, the Bidder shall submit a financial statement.  A copy of the proposed Financial Statement to be submitted with the bid is included in the bid documents section to these specifications.  The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request.  The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein.

Each Bidder is responsible for inspecting the Project site(s) and for reading and being thoroughly familiar with the Contract Documents and Specifications.  The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to its Bid.

Wage rates on the project shall not be less than the federal wage scale published by the U.S. Department of Labor.

Bidders on this work shall be required to comply with the provisions of the President’s Executive Order No. 11246, as amended.  The Bidders shall also comply with the requirements of 41 CFR Part 60 - 4 entitled Construction Contractors - Affirmative Action Requirements. A copy of 41 CFR Part 60 - 4 may be found in the Supplemental General Conditions of the Contract Documents and Specifications.

Bidders shall be aware of the requirements set by the Bipartisan Infrastructure Law of 2021, which mandate that all iron and steel, manufactured products, and construction materials used in a federal project must be produced in the United States. Pursuant to HUD’s Notice, “Public Interest Phased Implementation Waiver for FY 2022 and 2023 of Build America, Buy America Provisions as Applied to Recipients of HUD Federal Financial Assistance” (88 FR 17001), any funds obligated by HUD on or after the applicable listed effective dates, are subject to BABA requirements, unless excepted by a waiver.

The Bidders attention is also called to the “Minority/Women Owned Business Participation” and “Indiana Veteran Owned Small Business Program” requirements contained in the Project Specifications. The State of Indiana has set a goal of 10% participation for minority and women owned businesses and 3% participation of veteran owned businesses for construction or purchase related contracts for the work.

The Contractor must meet guidelines and practices established by the Indiana Office of Community and Rural Affairs and appropriate federal regulations including: 1) Executive Order 11246, 2) Section 3 of the Housing and Community Development Act of 1968, as amended, 3) Certification of NonSegregated Facilities, 4) OMB Circular A-102, 5) Title VI of the Civil Rights Act of 1964, 6) Section 504, Rehabilitation Act of 1973, 7) Age Discrimination Act of 1975, 8) Executive Order 12138, 9) Conflict of Interest Clause, 10) Retention and Custodial Requirements for Records Clause, 11) Contractors and Subcontractors Certifications, 12) Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. 177-58, 13) OMB’s Memorandum M-24-02; Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, 14) U.S. Housing and Urban Development CPD Notice 23-12; CPD Implementation Guidance for the Build America, Buy America Act’s domestic content procurement preference as part of the Infrastructure Investment and Jobs Act and others that may be appropriate or necessary.

Contract procurement is subject to the federal regulations contained in the OMB Circular A-102, Sections B and O and the State of Indiana requirements contained in IC-36-1-9 and IC-36-1-12.

Any contract(s) awarded under this Advertisement for Bids are expected to be funded in part by a grant from the Department of Housing and Urban Development, as administered by the Indiana Office of Community and Rural Affairs.  Neither the United States nor any of its departments, agencies or employees is or will be a party to this Advertisement for Bids or any resulting contract.

Pursuant to Chapter 5, 5-5 of the Labor Standards Administration and Basic Enforcement Handbook 1344.1 Rev 3; “No contract may be awarded to any contractor that is debarred, suspended or otherwise ineligible to participate in Federal or Federally assisted contracts or programs. Any contract awarded to a prime contractor or subcontractor that is found to be ineligible for award must be terminated immediately.” Prior to contract award prime contractors are to be actively registered or seeking registration with SAM.gov to determine eligibility/debarment status.

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

 

This Advertisement is issued by:

Owner:  St. Joe-Spencerville Regional Sewer District

By:          Loren Johnson

Title:      President

Date:     September 13th and September 20th, 2024

END OF ADVERTISEMENT FOR BIDS

St. Joe-Spencerville RSD

Wastewater Treatment Improvements

Re-Bid Bid Date: October 10, 2024 @ 10:00 A.M.

 

B L Anderson
4801 TAZER DR
LAFAYETTE, IN 47905
765-463-1518
BGASVODA@BLANDERSON.COM

 

The Builders Exchange
9555 Rockside Road 300
Valley View, OH  44125
216-393-6300
info@bxohio.com

 

American Pump Repair & Service
24 South Westside Drive
New Palestine Drive
317-861-6791
Jp3@americanpumprepair.com

 

Crosby Construction
2805 Freeman Street
Fort Wayne, IN 46802
260-432-5114
recrosby@recrosby.com

 

FCI Construction
5417 CR 427
Auburn, IN 46706
(260) 927-8516
gmouchaham@fci.construction

 

GFL Environmental Inc.
3204  Lower Huntington Rd
Fort Wayne, IN 46809
260-747-5037
breanne.henry@gflenv.com

 

Ottenweller Contracting, LLC.
1220 Edsall Ave.
Fort Wayne, IN 46803
260-484-9183
angela.wedler@ottenweller.com

 

DCN
300 American Metro Blvd
Ste 185
Hamilton, IN 08619
844-326-3826
lori.bachman@construction.com

 

R. Yoder Construction
27453 CR 150
PO Box 69
Nappanee, IN 46550
574-773-3502
brad@ryoderconstruction.com

 

RG Zachrich Construction Inc.
10105 Haller Street
Defiance, OH 43512
419-782-7846
natalie_h@zachrichconstruction.com

 

Kirk Bros. Co., Inc.
16380 US 224 E
Findlay, OH 45839
419-595-8996
j.gilts@kirkbros.com

 

Construct Connect
3825 Edwards Road
suite 800
Cincinnati, OH 45209
800-364-2059

 

Krafft Water Solutions, LLC.
5543 County Road 60
St. Joe, IN 46785
260-573-6593
ben.krafft@krafftwatersolutions.com

Additional information

Downloadable Set